Inspector checking a casting at the DINGDAR works
Quality & inspection

What Gets Checked, and What You Get in Writing

A casting is only as good as the evidence that travels with it. This page sets out the inspection points on a DINGDAR order, the records released with the shipment, and the scope we do not claim without checking first.

Inspection points

Five Stages, Five Records

Each stage produces a document. The scope is fixed in the technical review before production, not negotiated after the parts are cast.

StageWhat is checkedRecord released
Before pouringPattern and drawing review, material grade confirmed against the duty, melting charge checkedApproved drawing / part number, grade confirmation in the technical review
At pourMelt chemistry — manganese, chromium and carbon content against the specified gradeChemical composition report per heat
After heat treatmentHardness verification on the working sectionHardness results with test location noted
Before despatchDimensional check against drawing, visual inspection of working faces, casting defectsDimensional report; visual inspection record
On requestUltrasonic or magnetic-particle testing on heavy-section parts; third-party inspectionNDT report or third-party certificate, scope agreed before production
Why it matters

The Record Is the Argument

Wear part failures are usually argued after the fact, and the argument is almost never settled by opinion. A plate that cracked through a bolt hole, a liner that wore through in half the expected hours, a blow bar that chipped on the first day — each has a small set of possible causes, and the paperwork narrows them quickly. Chemistry tells you whether the grade poured matches the grade ordered. Hardness tells you whether the heat treatment landed. Dimensions tell you whether the part seated correctly. Without those three, every conversation about a failure starts from zero.

That is why the inspection scope is agreed at quotation stage. A buyer who specifies the evidence before production receives it with the shipment; a buyer who asks afterwards is asking a foundry to reconstruct a heat that has already been poured.

Straight answers

What We Do Not Claim

Certification lists published on websites go stale, and a stale certificate is worse than no certificate — it wastes a buyer's audit. We do not publish a badge wall. If your market or your customer requires a specific certificate, tell us the standard and the part, and the current scope for that combination is confirmed in writing with the quotation.

The same applies to capacity and lead-time claims: both are confirmed per project after the drawing and quantity are known, because a number that is right for a 200 kg mantle is wrong for a 4-tonne mill head.

Questions buyers ask

Inspection FAQ

What inspection records ship with an order?
As agreed in the technical review: a chemical composition report for the heat, hardness results, a dimensional report against the drawing, and a visual inspection record. NDT reports and third-party inspection certificates are added when they are specified before production.
Can I arrange third-party inspection before shipment?
Yes. Inspection by a nominated surveyor can be arranged at the works, and the scope — dimensional, material verification, NDT, marking — is agreed before production so the visit happens at the right stage rather than after packing.
Which certifications do you hold?
Certification scope depends on the product and the period, so we do not publish a list that may be out of date. Ask for the current scope for your part and market, and it is confirmed in writing with the quotation.
Can we visit the works before placing an order?
Yes. Factory visits can be arranged and are usually combined with a review of the part drawing and the proposed process route. Contact us with the dates you have in mind.

Specify the Evidence Up Front

Send the part, the standard you need to meet and your market — we confirm the inspection scope and the records that will ship with the order.

Discuss Inspection Scope
WhatsApp Us